# Submittal schedule

> Source: https://deviationcheck.com/glossary/submittal-schedule/

A planned list of every submittal a project expects, with the date each is due from the sub and needed back from the design team. It is built early so long lead items are reviewed in time to order.

Related terms: Submittal log, Long lead item, Submittal