Glossary
Field verification
Short answer
Measuring or confirming an existing jobsite condition before fabricating to it, often required by a shop drawing note to verify in field. Submittals that skip required field verification are a common detail and installation mismatch.
Related terms
View this page as Markdown for LLMs and note-taking.