# Deferred submittal

> Source: https://deviationcheck.com/glossary/deferred-submittal/

A portion of the design the building code allows the contractor to submit after the permit is issued, prepared by a specialty engineer and reviewed by the architect of record before fabrication. Trusses, fire sprinkler layouts, and curtain walls are common examples.

Related terms: Submittal, Shop drawing, Architect of record