# Submittal Package Incompleteness in Division 32 Exterior Improvements submittals

> Source: https://deviationcheck.com/divisions/32-exterior-improvements/submittal-package-incompleteness/

A required submittal element (cut sheet, schedule, calculation, sample) is missing, leaving the package unreviewable as submitted.

## What to look for in Division 32 Exterior Improvements

Commonly required items in Div 32 specs:
- Asphalt mix design report (Marshall or Superpave) from certified laboratory with mix design number and plant certification
- Concrete mix design with batch plant certification, admixture data sheets, and aggregate gradation
- Plant list with confirmed availability: species, caliper, height, spread, root ball size, and nursery source
- Irrigation design calculations: precipitation rate per zone, DU calculation, water budget, pipe sizing
- Site furnishing cut sheets with dimensions, weight, anchor details, and finish specifications
- Pavement marking product data sheet with reflectivity rating and cure time
- Athletic surface system drawing showing all layers (base, shock pad, pile carpet) with thicknesses
- Fencing post and panel structural calculations for wind load where required
- Aggregate base gradation report from certified lab
- Synthetic turf field test report (Gmax, HIC, traction, rotational resistance)
- Irrigation controller programming manual and water budget worksheet

---

## Severity

Default grade: Fix and Resubmit. The sub completes the package and resubmits before the PM can fully review.