# Submittal Package Incompleteness in Division 28 Electronic Safety and Security submittals

> Source: https://deviationcheck.com/divisions/28-electronic-safety-security/submittal-package-incompleteness/

A required submittal element (cut sheet, schedule, calculation, sample) is missing, leaving the package unreviewable as submitted.

## What to look for in Division 28 Electronic Safety and Security

Commonly required items in Div 28 specs:
- Fire alarm shop drawings (floor plans with device locations, riser diagrams, panel wiring)
- Sequence of operations matrix (input/output, cause and effect)
- Battery calculations per NFPA 72
- Voltage drop calculations for NAC circuits
- Device compatibility listing with FACP
- Point-to-point wiring diagrams
- Camera layout drawings with field-of-view diagrams
- Network architecture diagram (for IP-based systems)
- Storage calculations (camera count x resolution x frame rate x retention days)
- Access control riser diagram
- Door hardware schedule coordination (electrified hardware, locks, contacts, REX)
- NICET designer certification
- Contractor factory certification/authorization letter
- AHJ-required permit application documentation
- Programming and commissioning plan

---

## Severity

Default grade: Fix and Resubmit. The sub completes the package and resubmits before the PM can fully review.
