# Submittal Package Incompleteness in Division 27 Communications submittals

> Source: https://deviationcheck.com/divisions/27-communications/submittal-package-incompleteness/

A required submittal element (cut sheet, schedule, calculation, sample) is missing, leaving the package unreviewable as submitted.

## What to look for in Division 27 Communications

Commonly required items in Div 27 specs:
- Cabling system product data sheets (cable, connectors, patch panels, faceplates)
- Manufacturer system warranty documentation and installer authorization letter
- Telecommunications room layout drawings (rack elevations, equipment placement)
- Cable pathway layout and fill calculations per TIA-569
- Labeling plan per TIA-606
- Grounding and bonding plan per TIA-607
- Fiber optic link loss budget calculations
- Wireless site survey and predictive heat map (AP placement, coverage, channel plan)
- DAS RF design documentation (coverage maps, signal strength predictions)
- Test equipment specifications and calibration certificates
- Sample test reports (permanent link or channel per TIA-568)
- AV system signal flow diagrams and equipment rack elevations
- Paging/intercom zone layout and speaker coverage plan
- Project-specific installation details (firestop, seismic bracing, support methods)
- Training plan for owner's personnel

---

## Severity

Default grade: Fix and Resubmit. The sub completes the package and resubmits before the PM can fully review.
