# Submittal Package Incompleteness in Division 26 Electrical submittals

> Source: https://deviationcheck.com/divisions/26-electrical/submittal-package-incompleteness/

A required submittal element (cut sheet, schedule, calculation, sample) is missing, leaving the package unreviewable as submitted.

## What to look for in Division 26 Electrical

Commonly required items in Div 26 specs:
- Single-line diagrams
- Panel schedules with circuit assignments
- Equipment nameplate data / catalog cut sheets
- Wire and cable schedule
- Lighting fixture schedule with photometric data (IES files)
- Load calculations
- Short-circuit study results
- Arc flash labels / study
- Coordination study (time-current curves)
- Seismic anchorage calculations
- Warranty documentation
- O&M (Operation and Maintenance) manuals

---

## Severity

Default grade: Fix and Resubmit. The sub completes the package and resubmits before the PM can fully review.