# Submittal Package Incompleteness in Division 14 Conveying Equipment submittals

> Source: https://deviationcheck.com/divisions/14-conveying-equipment/submittal-package-incompleteness/

A required submittal element (cut sheet, schedule, calculation, sample) is missing, leaving the package unreviewable as submitted.

## What to look for in Division 14 Conveying Equipment

Commonly required items in Div 14 specs:
- Layout drawings (plan view of hoistway, pit, overhead, machine room)
- Elevation drawings showing all openings and travel
- Structural load reactions (for structural engineer review)
- Electrical power requirements (for electrical engineer review)
- Cab interior finish samples or detailed drawings
- Signal fixture samples or cut sheets (hall lanterns, COP, hall stations)
- Door operator and entrance details
- Controller and drive system specifications
- Firefighters' emergency operation sequence narrative
- Seismic design calculations (where required)
- Maintenance and warranty terms
- Escalator truss layout and support point reactions
- ADA compliance checklist covering car size, controls height, door timing, signals

---

## Severity

Default grade: Fix and Resubmit. The sub completes the package and resubmits before the PM can fully review.