# Submittal Package Incompleteness in Division 13 Special Construction submittals

> Source: https://deviationcheck.com/divisions/13-special-construction/submittal-package-incompleteness/

A required submittal element (cut sheet, schedule, calculation, sample) is missing, leaving the package unreviewable as submitted.

## What to look for in Division 13 Special Construction

Commonly required items in Div 13 specs:
- Clean room ISO classification test plan and commissioning protocol
- Air balance calculations showing ACH, pressurization cascade, and filter coverage
- Cold storage refrigeration load calculations and panel U-value data
- Pool hydraulic calculations (turnover rate, pipe sizing, pump curves)
- Lightning protection system design drawing with zone of coverage analysis
- Radiation shielding calculations signed by qualified health physicist
- Storm shelter structural calculations per ICC 500 loading criteria
- Seismic isolation system qualification test data per ASCE 7 Chapter 17
- Pre-engineered building design calculations (wind, snow, seismic, live load)
- Vault fire test reports and UL listing documentation
- Manufacturer installation manuals for specialty systems
- Installer qualification records and manufacturer authorization letters
- Warranty documentation with coverage terms and exclusions

---

## Severity

Default grade: Fix and Resubmit. The sub completes the package and resubmits before the PM can fully review.
