# Submittal Package Incompleteness in Division 10 Specialties submittals

> Source: https://deviationcheck.com/divisions/10-specialties/submittal-package-incompleteness/

A required submittal element (cut sheet, schedule, calculation, sample) is missing, leaving the package unreviewable as submitted.

## What to look for in Division 10 Specialties

Commonly required items in Div 10 specs:
- Product data sheets for each accessory, partition type, and specialty item
- ADA compliance documentation showing mounting heights and clearances
- Shop drawings for toilet partitions (layout, pilaster locations, door swings)
- Finish samples or sample chips (stainless steel, powder coat, laminate, HDPE color)
- Louver performance data (AMCA certified free area and water penetration ratings)
- Fire extinguisher cabinet UL listing certificate
- STC test report for operable partitions (tested per ASTM E90)
- Signage schedule with ADA-compliant layout, font size, Braille, and pictograms
- Warranty documentation (typically 1-5 years depending on product)
- Installation instructions from manufacturer
- Maintenance and cleaning instructions for stainless steel and specialty finishes
- LEED/sustainability documentation (recycled content, VOC data, GREENGUARD certificate)

---

## Severity

Default grade: Fix and Resubmit. The sub completes the package and resubmits before the PM can fully review.
