# Detail or Installation Mismatch in Division 10 Specialties submittals

> Source: https://deviationcheck.com/divisions/10-specialties/detail-installation-mismatch/

The submitted detail, dimension, anchorage, or installation method differs from what the spec or drawings require.

## What to look for in Division 10 Specialties

- **Toilet partition mounting type** differs (floor-mounted/overhead-braced vs ceiling-hung vs floor-to-ceiling)
- **Partition pilaster anchorage** method does not match structural conditions (concrete vs steel stud vs CMU)
- **Accessory mounting method** (surface-mounted vs semi-recessed vs fully recessed)
- **Grab bar mounting blocking** not coordinated with wall framing plan
- **Corner guard adhesive vs mechanical fastener** attachment differs from spec
- **Louver frame depth** does not match wall thickness
- **Louver blade angle and spacing** differ from specified profile
- **Operable partition track and header detail** does not match structural framing
- **Signage mounting method** (standoff pins vs flush-mount vs surface-applied)
- **Fire extinguisher cabinet recessed vs surface-mounted** does not match wall condition
- **Locker base and anchorage** (pedestal base vs slope-top vs recessed base) differs

## Severity

Default grade: Fix and Resubmit. Escalates to Blocker when the difference affects a fire-rated, seismic, or structural assembly.
