# Submittal Package Incompleteness in Division 07 Thermal and Moisture Protection submittals

> Source: https://deviationcheck.com/divisions/07-thermal-moisture-protection/submittal-package-incompleteness/

A required submittal element (cut sheet, schedule, calculation, sample) is missing, leaving the package unreviewable as submitted.

## What to look for in Division 07 Thermal and Moisture Protection

Commonly required items in Div 07 specs:
- Roof system warranty application with coverage terms
- Manufacturer's pre-installation inspection letter
- FM Approval or UL listing documentation for roof assembly
- Wind uplift calculations for the specific building and zone
- Insulation product data with R-value and fire test results
- Air barrier product data with permeance and adhesion test results
- Firestop system detail drawings matching UL/WHI listing
- Fireproofing thickness schedule by structural member size and fire rating
- Sealant compatibility test results (where spec requires)
- Core samples and moisture survey (for re-roofing projects)
- Installer qualification documentation (manufacturer-certified applicator)
- Mock-up or field sample requirements
- Maintenance plan for roof system warranty compliance

---

## Severity

Default grade: Fix and Resubmit. The sub completes the package and resubmits before the PM can fully review.
