# Submittal Package Incompleteness in Division 06 Wood, Plastics, and Composites submittals

> Source: https://deviationcheck.com/divisions/06-wood-plastics-composites/submittal-package-incompleteness/

A required submittal element (cut sheet, schedule, calculation, sample) is missing, leaving the package unreviewable as submitted.

## What to look for in Division 06 Wood, Plastics, and Composites

Commonly required items in Div 06 specs:
- Lumber grade stamps or mill certificates with species and grade
- Moisture content test reports or certification
- ICC-ES ESR reports for all engineered wood products and proprietary connectors
- Glulam shop drawings with combination symbol, camber, and connection details
- CLT panel shop drawings with layup, grade, and connection details
- Truss design drawings sealed by a licensed professional engineer
- FRT manufacturer's test reports and listing documentation
- AWPA treatment certificates with retention levels and use category
- AWI quality grade compliance documentation for architectural woodwork
- Shop drawings for architectural millwork with species, finish, and hardware
- Connector/hardware catalog data with allowable load tables
- Warranty documentation
- LEED documentation - FSC/PEFC chain-of-custody certificates, regional materials data

---

## Severity

Default grade: Fix and Resubmit. The sub completes the package and resubmits before the PM can fully review.
