# Submittal Package Incompleteness in Division 05 Metals submittals

> Source: https://deviationcheck.com/divisions/05-metals/submittal-package-incompleteness/

A required submittal element (cut sheet, schedule, calculation, sample) is missing, leaving the package unreviewable as submitted.

## What to look for in Division 05 Metals

Commonly required items in Div 05 specs:
- Structural steel shop drawings (connection details, member sizes, piece marks)
- Erection drawings and sequence
- Mill test reports (MTR) for all structural steel
- Weld Procedure Specifications (WPS)
- Bolt installation procedures (snug-tight, pre-tensioned, slip-critical)
- Torque verification records or Direct Tension Indicator (DTI) procedures
- Galvanizing certificates with thickness measurements
- Fireproofing compatibility letter from steel fabricator
- Joist and joist girder shop drawings with design loads
- Metal deck layout drawings with attachment pattern
- Miscellaneous metals shop drawings
- Railing shop drawings with anchorage details
- Coating/paint system product data with surface prep requirements

---

## Severity

Default grade: Fix and Resubmit. The sub completes the package and resubmits before the PM can fully review.