# Submittal Package Incompleteness in Division 02 Existing Conditions submittals

> Source: https://deviationcheck.com/divisions/02-existing-conditions/submittal-package-incompleteness/

A required submittal element (cut sheet, schedule, calculation, sample) is missing, leaving the package unreviewable as submitted.

## What to look for in Division 02 Existing Conditions

Commonly required items in Div 02 specs:
- Abatement contractor license (state-specific) and insurance certificate
- Worker and supervisor training certificates (asbestos, lead, mold)
- Abatement work plan / project design document
- Site-specific health and safety plan (HASP)
- Containment and negative air drawings
- Emergency response procedure (abatement-specific)
- Air monitoring firm qualifications and sampling protocol
- Waste characterization profile (for hazardous waste manifesting)
- Approved disposal facility acceptance letter
- EPA NESHAP notification copy (for regulated asbestos demolition/renovation)
- Inventory of materials to be abated with ACM classification
- Sampling laboratory accreditation certificates
- Post-abatement clearance testing protocol
- Chain of custody forms for air samples and bulk samples
- Contingency plan for unplanned ACM discovery (O&M trigger levels)

---

## Severity

Default grade: Fix and Resubmit. The sub completes the package and resubmits before the PM can fully review.